Message ID: 2366     Entry time: Wednesday, September 14, 2022, 13:45
Author: Adam Newsome 
Category: Spent Target Vault 
Type: Development 
Module:  
Target/Number:  
Subject: Storage Vault: cable replaced and e-chain upgrade 

The motor cable for the storage vault was replaced as the old one was showing signs of wear. The U-track that the old cable ran through was also bent as a result of being hit.

In the process of replacing the cable, an e-chain was installed for cable management purposes. Mounting brackets were modified and a new U-track was installed as well. The new hardware is more robust than what was previously installed.

The vault door was opened and closed multiple times while observing the e-chain - everything behaved as expected. The system is operational.

 

Solidworks model IRH0189 is updated to show the changes