Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2354     Entry time: Tuesday, August 09, 2022, 12:23
Author: Frank Song 
Category: North Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: Ta #64 
Subject: Electrical Check for TM4 with Ta#64 after beam at NHC 

 An electrical check made at NHC right after TM4 moving from ITE.

Attachment 1: tm4_with_Ta#64_after_beam_at_NHC.jpg.jpeg  612 kB  | Hide | Hide all
tm4_with_Ta#64_after_beam_at_NHC.jpg.jpeg
ELOG V2.9.2-2455