Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2343     Entry time: Monday, July 04, 2022, 11:44
Author: Nadia Jorgenson 
Category: Safe Module Parking 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: Annual Inspection of Safe Module Parking - Mechanical  

 

An annual mechanical inspection was performed on the SMP today by Dan McDonald and Nadia Jorgenson. The following items were checked:

 

  • Lubricate chains
    • Not needed
  • Inspect tensioners
    • No issues found
  • Tighten fasteners
    • A few slightly loose, most are in need of washers, see attached pictures
    • Could use some shims in a few places, see attached picture
  • Inspect components during rotation - chain drive, rotary limit switch, and cable reel etc.
    • No issues
Attachment 1: SMP_Missing_Washers_1.jpg  2.683 MB  | Show | Hide all
Attachment 2: SMP_Missing_Washers_2.jpg  2.544 MB  | Hide | Hide all
SMP_Missing_Washers_2.jpg
Attachment 3: SMP_Missing_shims.jpg  1.834 MB  | Show | Hide all
ELOG V2.9.2-2455