Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2327     Entry time: Monday, June 06, 2022, 14:15
Author: Frank Song 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: SiC#42 
Subject: TM2 FEBIAD with Target and No external Connections 

 An electrical check was done at SHC for TM2 with FEBIAD SiC #42 Target. 

Attachment 1: TM2_with_FEBIAD_SiC_42_electrical_check.jpg  672 kB  | Show | Show all
ELOG V2.9.2-2455