Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2316     Entry time: Thursday, April 28, 2022, 07:24
Author: Frank Song 
Category: ITW 
Type: Standard Operation 
Module: TM2 
Target/Number: Febiad Test Target 
Subject: Module Connection 

 TM2 was connected in ITW with a Febiad Test Target. 

Attachment 1: module_connection_checklist20220426.jpg  586 kB  | Show | Show all
ELOG V2.9.2-2455