Message ID: 2246     Entry time: Friday, September 17, 2021, 12:34
Author: Frank Song 
Category: ITE 
Type: Standard Operation 
Module: TM4 
Target/Number: Sic#41 
Subject: Module Connection 

 TM4 with a new target was moved back from NHC to ITE and reconnected at pit. The 5 shielding blocks were installed as well. Copies of connection checklist are attached here.