Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
2202
Entry time:
Wednesday, March 17, 2021, 11:43
Author:
Frank Song
Category:
ITE
Type:
Repair
Module:
Target/Number:
Subject:
Re-connect Entrance Module in ITE
David and I re-connect Entrance module at ITE after the monitor been replaced at SHC.
Attachment 1:
job_done_by_following_#190510.pdf
1.186 MB
|
Hide
|
Hide all
ELOG V2.9.2-2455