Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
2103
Entry time:
Wednesday, June 17, 2020, 09:49
Author:
chad fisher
Category:
South Hot-Cell
Type:
Standard Operation
Module:
TM4
Target/Number:
C#1
Subject:
C#1 installed
Target C#1 has been installed on TM4 with new high current fasteners torqued to 130in lbs.
Attachment 1:
C#1_Target.jpg
1.925 MB
|
Hide
|
Hide all
ELOG V2.9.2-2455