Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 206     Entry time: Wednesday, November 07, 2012, 09:25
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM1 
Target/Number: TiC#3 
Subject: Electrical check 

TM#1 with TiC#3 target has had the electrical performed on it. See attached PDF for details.

Attachment 1: TM_1_TiC_3_Elec_check_SHC.PDF  196 kB  | Hide | Hide all
TM_1_TiC_3_Elec_check_SHC.PDF
ELOG V2.9.2-2455