Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1994     Entry time: Tuesday, October 01, 2019, 10:22
Author: chad fisher 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: ZrC#8 
Subject: ZrC#8 Removed Ta#59 installed 

ZrC#8 has been removed from TM2. Upon removal of the high current tube heater bolts it was noticed that the tube was broken. Also the 9 pin connector has an arc mark (see pictures attached).

Ta#59 has been installed with new fasteners. High current fasteners torqued to 130 in lbs.

Attachment 1: 20190930_140918[1].jpg  2.944 MB  | Show | Show all
ELOG V2.9.2-2455