Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1939     Entry time: Monday, June 10, 2019, 18:12
Author: Carla Babcock 
Category: Conditioning Station 
Type: Maintenance 
Module: TM4 
Target/Number: No target 
Subject: Attempt to push bias > 56kV 

Monday, June 10, 2019, 16:59 : TM4 back up to BIAS / EL = 56.1kV / 29.5kV

Monday, June 10, 2019, 17:14 : After 57kV on the bias, things seem to be getting sketchy. The EL voltage and current are a bit jumpy and stepping that voltage up seems to produce a slight spike in the bias current.

Monday, June 10, 2019, 17:31 : At BIAS / EL = 58 / 30.3, looks ok.

Monday, June 10, 2019, 18:11 : Sitting at 59.5kV, could probably push further but will sit here for ~30mins and make sure it is relatively stable. Note 59.5kV set point is really 56.9kV on readout.

Monday, June 10, 2019, 18:18 : some current inconsistencies (not really sparks probably corona discharges...) so went down to 59kV

Monday, June 10, 2019, 18:23 : still getting some sparks at 58kV, going down to 57.5.

Monday, June 10, 2019, 18:37 : went back up to 58, spent 10 mins there but was getting these corona-discharge-type-sparks where the vacuum responds and current is drawn but voltage is maintained. Went down to 57kV, still getting them....

Monday, June 10, 2019, 18:40 : Going down to 56 to see if they stop....

Monday, June 10, 2019, 18:42 : Trying 55 kV now... see attached screenshot for example of sparks

Monday, June 10, 2019, 18:48 : No luck at 55 or 54kV. Going down to BIAS / EL = 50 / 27 for a while to see if this resolves

Monday, June 10, 2019, 19:20 : 30 mins at 50kV, a couple little sparks, but no big deal. Ramping up to 55 and let's see if it is ok.

Monday, June 10, 2019, 19:30 : 55 still not working, going down to 54

Monday, June 10, 2019, 20:16 : Held bias at 54kV for about an hour - dropped it down once to alleviate some sparking. Leaving it at 50kV overnight, ops have instructions to keep an eye on it and shut it off if anything seems strange.

Attachment 1: Screenshot_-_06102019_-_06_43_17_PM.png  40 kB  Uploaded Monday, June 10, 2019, 19:47  | Show | Show all
ELOG V2.9.2-2455