Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1883     Entry time: Tuesday, March 05, 2019, 14:29
Author: chad fisher 
Category: South Hot-Cell 
Type: Repair 
Module:  
Target/Number:  
Subject: Tray Transfer Fixture Repair Complete 

Repair of the tray transfer fixture is complete (minus testing).

A distorted ball nut lock plate was replaced and thread loc added. to the ball nut/plate assembly. Testing will take place tomorrow once the thread lock has a chance to cure.

Attachment 1: 20190305_130312.jpg  1.735 MB  | Hide | Hide all
20190305_130312.jpg
Attachment 2: 20190305_132303.jpg  1.172 MB  | Show | Hide all
Attachment 3: 20190305_133800.jpg  1.014 MB  | Show | Hide all
Attachment 4: 20190305_141346.jpg  1.254 MB  | Show | Hide all
ELOG V2.9.2-2455