Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1830     Entry time: Wednesday, November 28, 2018, 07:04
Author: David Wang 
Category: ITE 
Type: Development 
Module: TM4 
Target/Number: LpTa 56 
Subject: New high current flexible cables inspection after LpTa#56 beam run. 

Inspected new high current flexible cables during TM4 disconnection. The new cables and adapters work fine.

Attachment 1: new_flexibble_cable_in_ITE_after_Ta#56_run_001.JPG  2.634 MB  | Show | Show all
Attachment 2: new_flexibble_cable_in_ITE_after_Ta#56_run_004.JPG  2.509 MB  | Show | Show all
ELOG V2.9.2-2455