Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1809     Entry time: Thursday, October 25, 2018, 11:03
Author: chad fisher 
Category: South Hot-Cell 
Type: Repair 
Module:  
Target/Number:  
Subject: Exit 2 West 

Actuator arms, lemos, lemos and banana plug block have been disconnected in preparation for raising of the service tray. Aaron has pictures

Attachment 1: 20181025_102518.jpg  1.804 MB  Uploaded Friday, October 26, 2018, 12:46  | Show | Hide all
Attachment 2: 20181025_102526.jpg  921 kB  Uploaded Friday, October 26, 2018, 12:47  | Show | Hide all
Attachment 3: 20181025_104351.jpg  1.193 MB  Uploaded Friday, October 26, 2018, 12:47  | Show | Hide all
Attachment 4: 20181025_104508.jpg  1.167 MB  Uploaded Friday, October 26, 2018, 12:48  | Show | Hide all
Attachment 5: 20181025_104717.jpg  703 kB  Uploaded Friday, October 26, 2018, 12:49  | Show | Hide all
Attachment 6: 20181025_105427.jpg  1.072 MB  Uploaded Friday, October 26, 2018, 12:49  | Show | Hide all
Attachment 7: 20181025_105601.jpg  1.324 MB  Uploaded Friday, October 26, 2018, 12:50  | Hide | Hide all
20181025_105601.jpg
Attachment 8: 20181025_104225.jpg  1.709 MB  Uploaded Friday, October 26, 2018, 12:51  | Show | Hide all
ELOG V2.9.2-2455