Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
1750
Entry time:
Tuesday, July 03, 2018, 14:42
Author:
David Wang
Category:
ITW
Type:
Standard Operation
Module:
TM2
Target/Number:
Nb#8
Subject:
TM2 has been connected to ITW.
TM2 has been connected to ITW. All turbo pumps are started. See attachment for connection checklist.
Attachment 1:
Nb#4_Module_connection_checklist.pdf
587 kB
|
Hide
|
Hide all
ELOG V2.9.2-2455