Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1642     Entry time: Friday, October 13, 2017, 11:14
Author: Keith C Ng 
Category: Assembly/Bench Test 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: source tray alignment/build 

Source tray is complete for brazing, gas line bracket is currently missing but can be made in parallel with tube bending operations.

Source tray water lines to be fabricated according to ITA6144 drawing set.

- Alignment between target mounting plate and steerer cone is holding within .002"

- Aluminum soldering jigs are installed in place of the ceramics with fasteners only torqued just past "finger tight".

Attachment 1: 20171013_sourcetray_P1030815.JPG  5.370 MB  | Show | Hide all
Attachment 2: 20171013_sourcetray_P1030816.JPG  5.505 MB  | Show | Hide all
Attachment 3: 20171013_sourcetray_P1030817.JPG  5.254 MB  | Hide | Hide all
20171013_sourcetray_P1030817.JPG
Attachment 4: 20171013_sourcetray_P1030818.JPG  5.366 MB  | Show | Hide all
ELOG V2.9.2-2455