Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1639     Entry time: Tuesday, October 10, 2017, 10:45
Author: David Wang 
Category: Conditioning Station 
Type: Repair 
Module:  
Target/Number:  
Subject: Re-route TCS water lines. 

TCS  cooling polyurethane lines have been re-routed to solve to HV sparking issue on old configuration between lines and bais plate.  New re-routed system is tested to 70KV without spark. No leak has been found on new lines after the test.

ECO 4369, drawings and models IRH1715, IRH1716 have been issued and released for this job. Drawings and Models are located in PDM-ISAC1 -TCS polyurethane water lines re-route folder.

Attachment 1: TCS_re-route_001.JPG  2.298 MB  | Show | Hide all
Attachment 2: TCS_re-route_002.JPG  2.452 MB  | Show | Hide all
Attachment 3: TCS_re-route_003.JPG  2.625 MB  | Show | Hide all
Attachment 4: TCS_re-route_004.JPG  2.499 MB  | Hide | Hide all
TCS_re-route_004.JPG
Attachment 5: TCS_re-route_005.JPG  2.494 MB  | Show | Hide all
Attachment 6: TCS_re-route_006.JPG  2.333 MB  | Show | Hide all
Attachment 7: TCS_re-route_007.JPG  2.383 MB  | Show | Hide all
Attachment 8: TCS_re-route_008.JPG  2.550 MB  | Show | Hide all
ELOG V2.9.2-2455