Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 15     Entry time: Thursday, July 28, 2011, 12:02
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM1 
Target/Number: Ta#37 
Subject: Electrical check 

TM#1 has passed the the electrical check.

Attachment 1: Electrical_Check_for_TM_1_with_Target_attached_Ta37.pdf  22 kB  | Hide | Hide all
Electrical_Check_for_TM_1_with_Target_attached_Ta37.pdf
ELOG V2.9.2-2455