Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1519     Entry time: Tuesday, May 02, 2017, 13:49
Author: Travis Cave 
Category: Spent Target Vault 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: Spent Targets moved 

Five spent targets have been moved from the target storage vault to the mini vault in preparation for Thursdays loading of the F-308s. See attached for the list of targets in the mini vault, and the new status of the storage vault.

Attachment 1: Mini_Vault_Storage_May_2_2017.pdf  43 kB  | Hide | Hide all
Mini_Vault_Storage_May_2_2017.pdf Mini_Vault_Storage_May_2_2017.pdf Mini_Vault_Storage_May_2_2017.pdf Mini_Vault_Storage_May_2_2017.pdf
Attachment 2: Vault_Storage_May_2_2017.pdf  52 kB  | Show | Hide all
ELOG V2.9.2-2455