Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1465     Entry time: Monday, March 27, 2017, 12:55
Author: David Wang 
Category: Spent Target Vault 
Type: Repair 
Module:  
Target/Number:  
Subject: S/W silo rust clean up 

Rust on S/W silo and cover plate stored at silo area are cleaned up.

Attachment 1: rust_removal_at_sw_silo_001.JPG  2.251 MB  | Show | Hide all
Attachment 2: rust_removal_at_sw_silo_002.JPG  1.951 MB  | Show | Hide all
Attachment 3: rust_removal_at_sw_silo_003.JPG  2.004 MB  | Hide | Hide all
rust_removal_at_sw_silo_003.JPG
Attachment 4: rust_removal_at_sw_silo_004.JPG  2.312 MB  | Show | Hide all
Attachment 5: rust_removal_at_sw_silo_005.JPG  2.422 MB  | Show | Hide all
ELOG V2.9.2-2455