Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1334     Entry time: Wednesday, August 24, 2016, 11:06
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: Ta#49 
Subject: module moved and electrical check 

TM#2 with Ta#49 has had its electrical check and was moved to the conditioning station. see the attached pdf for the electrical check details.

The electrical check has been edited to reflect that well the original has been just not the PDF.

Attachment 1: TM2_elechk_SiC34_SHC.PDF  147 kB  | Show | Show all
ELOG V2.9.2-2455