Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1311     Entry time: Tuesday, August 09, 2016, 11:36
Author: Anders Mjos 
Category: Conditioning Station 
Type: Maintenance 
Module:  
Target/Number:  
Subject: RGA and CG1S moved 

 The locations (ports) for the RGA and CG1S was swapped today by Anders and Isaac to provide clearance for the North Hot Cell ventilation. Attached photos show old and new locations.

Attachment 1: Old.JPG  2.553 MB  | Show | Show all
Attachment 2: New.JPG  2.937 MB  | Show | Show all
ELOG V2.9.2-2455