Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 124     Entry time: Monday, June 11, 2012, 10:52
Author: Travis Cave 
Category: Spent Target Vault 
Type: Standard Operation 
Module:  
Target/Number: Nb#6 
Subject: Spent target move 

The Nb#6 target has been moved from the south hot cell into storage. It was place in pail #95 and is in slot 5C of the vault. See attached file for more details.

Attachment 1: Vault_Storage_June_11_2012.pdf  50 kB  | Hide | Hide all
Vault_Storage_June_11_2012.pdf Vault_Storage_June_11_2012.pdf Vault_Storage_June_11_2012.pdf Vault_Storage_June_11_2012.pdf
ELOG V2.9.2-2455