Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 123     Entry time: Friday, June 08, 2012, 15:03
Author: Don Jackson 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM1 
Target/Number: Ta38 
Subject: Electrical Check on new Ta38 at hot cell 

Megger checks were exceptionally high (good).  Readings taken less than 2 hours after reading low values from end of run on Nb#6.  Tests on Ta38 will be repeated at conditioning station later.

Attachment 1: Ta38_New_Target.JPG  1.310 MB  | Hide | Hide all
Ta38_New_Target.JPG
ELOG V2.9.2-2455