Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1214     Entry time: Friday, April 22, 2016, 14:07
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM2 
Target/Number:  
Subject: 2016 Winter Shut Down Target Hall Schedule 

Weekly update.This is the last update on 2016 winter shut down schedule. The new TH schedule for beam130  will be posted weekly after this. All jobs in winter shut down schedule were finished on time.

 

Attachment 1: 2016_winter_shut_down__target_hall_schedule.pdf  147 kB  | Show | Show all
Attachment 2: 2016_winter_shut_down__target_hall_schedule.mpp  383 kB
ELOG V2.9.2-2455