Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1183     Entry time: Wednesday, March 30, 2016, 08:40
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: 2016 Winter Shut Down Target Hall Schedule 

update the schedule according to changes.See attachment1, 2.

Attachment 1: 2016_winter_shut_down__target_hall_schedule.pdf  164 kB  | Show | Show all
Attachment 2: 2016_winter_shut_down__target_hall_schedule.mpp  390 kB
ELOG V2.9.2-2455