Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
|
RH-ISAC |
Not logged in |
|
|
Message ID: 1097
Entry time: Tuesday, October 13, 2015, 10:53
|
Author: |
David Wang |
Category: |
Conditioning Station |
Type: |
Standard Operation |
Module: |
|
Target/Number: |
|
Subject: |
Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 |
|
|
Weekly update schedule. TM3 evaluation schedule in Nov is added.
update the schedule after the cancellation of TM2 from SHC to CS trip.see attachments 3,4 |
|
|
|
|
|