Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1073     Entry time: Tuesday, September 22, 2015, 11:35
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: UC#13 
Subject: Electrical Check 

TM#4 with UC#13 post beam electrical check. Also and electrical check was done without the target on.

Attachment 1: TM4elecchkUC13postbeamSHC.PDF  241 kB  | Hide | Hide all
TM4elecchkUC13postbeamSHC.PDF TM4elecchkUC13postbeamSHC.PDF
Attachment 2: TM4_elecchk_totgt_with_IGLISline.PDF  172 kB  | Show | Hide all
ELOG V2.9.2-2455