Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1071     Entry time: Thursday, September 17, 2015, 11:50
Author: David Wang 
Category: Spent Target Vault 
Type: Repair 
Module: TM1 
Target/Number:  
Subject: TM1 window circuit leak check 

 Leak check TM1 window circuit soldering stems inside service cap when module is located at NE silo. LD base LR 0.0xE-9atm.cc/sec.  Only 1 second tiny amount  helium sprayed on stems soldering joints . LD got a quick response to high E-7 atm.cc/sec.Test is repeated again with same result.  See attachments

Attachment 1: TM1_leak_soldering_stems_001.JPG  2.622 MB  | Hide | Hide all
TM1_leak_soldering_stems_001.JPG
Attachment 2: TM1_leak_soldering_stems_003.JPG  1.730 MB  | Show | Hide all
ELOG V2.9.2-2455