Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1058     Entry time: Tuesday, September 01, 2015, 10:38
Author: David Wang 
Category: ITW 
Type: Maintenance 
Module: TM2 
Target/Number:  
Subject: ITW top tank flange clean up and r-ring replacement. 

During last run, ITW dump circuit had a water leak on an adaptor below the pressure gauge. The top tank flange, slot, and O-ring were water contaminated by the leak. I removed the old o- ring, cleaned up the flange and o-ring slot, and put a new o-ring into the flange. Some  pictures will be attached in this mail later.

Attachment 1: ITW_o-ring_replacement_2015-09-01_008.JPG  2.465 MB  Uploaded Wednesday, September 02, 2015, 08:14  | Hide | Hide all
ITW_o-ring_replacement_2015-09-01_008.JPG
Attachment 2: ITW_o-ring_replacement_2015-09-01_007.JPG  2.543 MB  Uploaded Wednesday, September 02, 2015, 08:14  | Show | Hide all
Attachment 3: ITW_o-ring_replacement_2015-09-01_006.JPG  2.460 MB  Uploaded Wednesday, September 02, 2015, 08:15  | Show | Hide all
ELOG V2.9.2-2455