Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1002     Entry time: Monday, July 20, 2015, 14:12
Author: chad fisher 
Category: South Hot-Cell 
Type: Repair 
Module: TM2 
Target/Number:  
Subject: TM2 Status 

Ultem high voltage spacer installed and 9 pin banana plug plugged in. Target has been inserted into the hot cell and will be installed after base-line electrical checks...probably first thing in the morning.

Attachment 1: 20150720_134819.jpg  1.039 MB  | Hide | Hide all
20150720_134819.jpg
Attachment 2: 20150720_135747.jpg  1.001 MB  | Show | Hide all
Attachment 3: 20150720_140100.jpg  992 kB  | Show | Hide all
ELOG V2.9.2-2455