Entry  Wednesday, April 23, 2025, 10:34, Adam Newsome, Cyclotron, Standard Operation, Vault Shield Door Closed 

The vault shield door has been closed and seal inflated. The operation was performed with no issue.

Entry  Wednesday, April 23, 2025, 16:02, Adam Newsome, Infrastructure, Standard Operation, Safety Walkaround Complete - RH Shop, Back Shop, B1, and B2 levels  

A safety walkaround was completed for the RH Shop, Back Shop, B1, and B2 levels.

The resulting spreadsheet can be found on DocuShare as Document-242733.

Main deficiencies identified:

  • B2:
    • Rad-waste to be removed - cleanup day scheduled for June

 