Wednesday, April 23, 2025, 10:34, Adam Newsome, Cyclotron, Standard Operation, Vault Shield Door Closed
|
The vault shield door has been closed and seal inflated. The operation was performed with no issue. |
Wednesday, April 23, 2025, 16:02, Adam Newsome, Infrastructure, Standard Operation, Safety Walkaround Complete - RH Shop, Back Shop, B1, and B2 levels
|
A safety walkaround was completed for the RH Shop, Back Shop, B1, and B2 levels.
The resulting spreadsheet can be found on DocuShare as Document-242733.
Main deficiencies identified:
- B2:
- Rad-waste to be removed - cleanup day scheduled for June
|
|