Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Cyclotron, Page 11 of 11  Not logged in ELOG logo
ID Date Authordown Category Type Subject Text Attachments
  201   Wednesday, April 23, 2025, 10:34 Adam NewsomeCyclotronStandard OperationVault Shield Door ClosedThe vault shield door has been closed and
seal inflated. The operation was performed
with no issue.
  
  202   Wednesday, April 23, 2025, 16:02 Adam NewsomeInfrastructureStandard Operation Safety Walkaround Complete - RH Shop, Back Shop, B1, and B2 levels A safety walkaround was completed for the
RH Shop, Back Shop, B1, and B2 levels.
The resulting spreadsheet can be
  
ELOG V2.9.2-2455