  201   Wednesday, April 23, 2025, 10:34 Adam NewsomeCyclotronStandard OperationVault Shield Door Closed

The vault shield door has been closed and seal inflated. The operation was performed with no issue.

  202   Wednesday, April 23, 2025, 16:02 Adam NewsomeInfrastructureStandard Operation Safety Walkaround Complete - RH Shop, Back Shop, B1, and B2 levels

A safety walkaround was completed for the RH Shop, Back Shop, B1, and B2 levels.

The resulting spreadsheet can be found on DocuShare as Document-242733.

Main deficiencies identified:

  • B2:
    • Rad-waste to be removed - cleanup day scheduled for June

 