Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Cyclotron  Not logged in ELOG logo
Message ID: 99     Entry time: Tuesday, March 14, 2017, 12:02
Author: Jason Kapalka 
Category: Cyclotron 
Type: Standard Operation 
Subject: Radiation survey 
The unshielded radiation survey was performed in the Cyclotron tank by the RH group using the service bridge, 
tool trolley, and radiation survey attachment on 2017-01-30 (see attached plot).

The shielded radiation survey was performed in the Cyclotron tank by the RH group using the service bridge, 
tool trolley, and radiation survey attachment on 2017-02-02 (see attached plot).

A obsolete version of the radiation survey procedure (from Don Jackson) that needs revising and the MATLAB code 
for generating a radiation survey map (from Maxim Kinakin) is attached.
Attachment 1: Procedure_for_Cyclotron_Tank_Radiation_Survey_by_Don_Jackson_(20000106_Obsolete).doc  29 kB
Attachment 2: tankworkssubplot.m  2 kB  | Show | Show all
Attachment 3: 2017_01_30_shields_out_tank_superimposed.png  300 kB  | Show | Show all
Attachment 4: 2017_02_02_shields_in.png  307 kB  | Show | Show all
ELOG V2.9.2-2455