Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Cyclotron  Not logged in ELOG logo
Message ID: 90     Entry time: Wednesday, September 14, 2016, 11:30
Author: Dan McDonald 
Category: Elevation Jack 
Type: Maintenance 
Subject: Jack station 10B 

Annual jack maintenance : Jack 10b upon inspection it was found that the output shaft seal on 10b was in need of replacement. In past years RH personal had to remove a LoveJoy coupling which required cutting of the coupler due to galling and possible interference tolerances being out. We sourced sample split seals from Motion Canada that can be installed with out coupling removal we will install and monitor to determine the effectiveness and the possibility of converting all jack stations to this seal design . Attached are pictures of old seal style, new style seal, worm, wheel housing, current coupling on shaft, old coupling that has been cut off and various components. The jack components appear to be in good working order, no extra ordinary maintenance needs to be performed besides seal replacement. 

Attachment 1: IMG_1240.JPG  2.280 MB  | Show | Hide all
Attachment 2: IMG_1241.JPG  2.599 MB  | Show | Hide all
Attachment 3: IMG_1243.JPG  3.179 MB  | Show | Hide all
Attachment 4: IMG_1244.JPG  2.055 MB  | Show | Hide all
Attachment 5: IMG_1245.JPG  2.461 MB  | Show | Hide all
Attachment 6: IMG_1246.JPG  2.409 MB  | Show | Hide all
Attachment 7: IMG_1247.JPG  2.634 MB  | Hide | Hide all
IMG_1247.JPG
Attachment 8: IMG_1251.JPG  1.862 MB  | Show | Hide all
Attachment 9: IMG_1254.JPG  2.801 MB  | Show | Hide all
Attachment 10: IMG_1255.JPG  2.944 MB  | Show | Hide all
Attachment 11: IMG_1256.JPG  2.818 MB  | Show | Hide all
Attachment 12: IMG_1257.JPG  2.336 MB  | Show | Hide all
Attachment 13: IMG_1258.JPG  2.495 MB  | Show | Hide all
Attachment 14: IMG_1259.JPG  2.474 MB  | Show | Hide all
ELOG V2.9.2-2455