Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Cyclotron  Not logged in ELOG logo
Message ID: 73     Entry time: Tuesday, October 27, 2015, 07:50
Author: maicodallavalle 
Category: Elevation Jack 
Type: Standard Operation 
Subject: Service to Station # 9 Right side 

 Station #9 Cleaning of  discoloration-

The right side Jack screw nut and worm screw (mating parts in the right side Jack) had some discoloration from may years ago it is thought.

These two parts were cleaned with Scotch Brite.

The Jack was reassembled with grease.Station #9 has been fully serviced and is ready for 2016 Shut Down to be put back in place.

 

 

 

Attachment 1: IMG_2099.JPG  548 kB  | Show | Hide all
Attachment 2: IMG_2101.JPG  487 kB  | Show | Hide all
Attachment 3: IMG_2103.JPG  510 kB  | Show | Hide all
Attachment 4: IMG_2100.JPG  568 kB  | Show | Hide all
Attachment 5: IMG_2102.JPG  525 kB  | Hide | Hide all
IMG_2102.JPG
Attachment 6: IMG_2095.JPG  462 kB  | Show | Hide all
Attachment 7: IMG_2097.JPG  387 kB  | Show | Hide all
Attachment 8: IMG_2096.JPG  382 kB  | Show | Hide all
Attachment 9: IMG_2098.JPG  382 kB  | Show | Hide all
ELOG V2.9.2-2455