Message ID: 23     Entry time: Thursday, April 11, 2013, 19:00
Author: Grant Minor 
Category: Elevation Jack 
Type: Maintenance 
Subject: Upper Bearing at Jack Station 9 + Fall Protection Upgrades 

There was a brief access period to the Cyclotron vault during April 9 to 12, 2013 due to other Cyclotron issues.

This time was utilized to perform the following Elevating System tasks:

- Drilling of 2 (two) holes for concrete anchors (DBI Sala Product 2100085) for self-retracting lifelines (see TRIUMF purchase order TR197399)

- Installation of 2 (two) ceiling-hung self-retracting lifeline units, one above the climb-up access point to the bearing, and the other above the recently installed outboard safety platform (see TRH1217)

- Complete service of the upper bearing assembly at Station 9 (dis-assembly of bearing races, cleaning off old grease, inspection of races and guide tube, application of new grease, re-assembly of races)

- Tear down of safety handrails for some minor modifications (see upcoming Rev B to TRH1217 and sub-components)

 All work was completed on Wednesday April 10th by Dan Wright and Maico Dalla Valle.

Attachment 1: station_9_ceiling_anchors_SRLs_10april2013-002.JPG  1.854 MB  Uploaded Friday, April 12, 2013, 17:33  | Hide | Hide all
station_9_ceiling_anchors_SRLs_10april2013-002.JPG
Attachment 2: station_9_ceiling_anchors_SRLs_10april2013-003.JPG  2.037 MB  Uploaded Friday, April 12, 2013, 17:33  | Show | Hide all
Attachment 3: station_9_ceiling_anchors_SRLs_10april2013-004.JPG  1.930 MB  Uploaded Friday, April 12, 2013, 17:34  | Show | Hide all
Attachment 4: station_9_ceiling_anchors_SRLs_10april2013-006.JPG  1.996 MB  Uploaded Friday, April 12, 2013, 17:35  | Show | Hide all
ELOG V2.9.2-2455