Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Cyclotron  Not logged in ELOG logo
Message ID: 19     Entry time: Friday, March 15, 2013, 08:39
Author: Don Jackson 
Category: Cyclotron 
Type: Standard Operation 
Subject: Pre Lid Down In Tank Video Survey 

In tank survey completed.  A few items of interest were found.  Ladders need to moved manually outboard to #5 resonators and the items noted in attached document need to be addressed.

Attachment 1: Pre_Lid_Down_Survey_2013.pdf  324 kB  | Show | Show all
ELOG V2.9.2-2455