The following items from Phase 1 of 2 of Bridge Lift Mechanism Refurbishment (O504) are complete:
- Replacement of pneumatic tubing
- Replacement of hydraulic cylinders for lifting, and procurement of spare
The newly refurbished system has been tested by Dan McDonald (June 16, 2021) and verified as functioning.
Phase 2 of the refurbishment will include replacement of the hydraulic pump and creation of pneumatic/hydraulic drawings. This is expected to be complete by end of 2022.
[Edit 2024-10-16]: Phase 2 has been completed. See e-log 191 |