Message ID: 134     Entry time: Wednesday, June 16, 2021, 09:59
Author: Adam Newsome 
Category: Service Bridge 
Type: Development 
Subject: Bridge Lift Mechanism Refurbishment (Phase 1 of 2) - Complete 

The following items from Phase 1 of 2 of Bridge Lift Mechanism Refurbishment (O504) are complete:

  • Replacement of pneumatic tubing
  • Replacement of hydraulic cylinders for lifting, and procurement of spare

The newly refurbished system has been tested by Dan McDonald (June 16, 2021) and verified as functioning.

Phase 2 of the refurbishment will include replacement of the hydraulic pump and creation of pneumatic/hydraulic drawings. This is expected to be complete by end of 2022.

 

[Edit 2024-10-16]: Phase 2 has been completed. See e-log 191

Attachment 1: PXL_20210519_210527283_-_Copy.jpg  3.040 MB  | Hide | Hide all
PXL_20210519_210527283_-_Copy.jpg
Attachment 2: PXL_20210216_175228151_-_cylinder_air_tubing_replaced.jpg  1.140 MB  | Show | Hide all
Attachment 3: PXL_20210615_171909579.jpg  1.322 MB  | Show | Hide all
ELOG V2.9.2-2455