Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Beamlines  Not logged in ELOG logo
Message ID: 99     Entry time: Friday, February 10, 2017, 15:53
Author: Keith C Ng 
Category: M9 
Type: Development 
Subject: t2 m9 job 

Installed all jigs and Alignment group did their shoots successfully. Used individual pins on the 15" target jig and worked ok. 8" target jig has some previously undiscovered issues from the previous shoot from 2015 but did not affect this shoot.

Attachment 1: 20170210_t2m9alignment_P1030604.JPG  5.048 MB  | Show | Show all
ELOG V2.9.2-2455