Message ID: 98     Entry time: Thursday, February 09, 2017, 16:14
Author: Keith C Ng 
Category: M9 
Type: Development 
Subject: t2 m9 alignment 

Prepared m9 and b1 flanges for accepting their target jigs. The target jigs need to be reset by alignment group, 15" was bumped and 8" lost 2 of the target balls into the beam line. Reflector balls were recovered with a magnet on a stick, contaminated with 250 CPM, need alignment group to decontaminate and clean them before use and reset the two jigs.

Syd installed two springs on the 8" target jig and only one spring is needed.

Attachment 1: 20170209_t2m9alignment_P1030588.JPG  5.271 MB  | Show | Hide all
Attachment 2: 20170209_t2m9alignment_P1030586.JPG  5.447 MB  | Hide | Hide all