RH-Beamlines |
Not logged in |
|
|
Message ID: 91
Entry time: Wednesday, March 16, 2016, 17:19
|
Author: |
Ron Kuramoto |
Category: |
Primary Beamlines |
Type: |
Development |
Subject: |
4VQ3 Removal |
|
|
On 8March2016, under W/P C2016-03-08-2, 4VQ3 was lifted out of BL4V with the vault orbit crane where it was first weighed then lifted onto the RH flat deck rail dolly. It was then moved into the RH basement where it was surveyed before lifting it up onto the Red wagon cart in the RH loading bay. It was then pulled to the Meson Hall loading bay by fork lift where and then over the Cycloton vault to the top of the E-Hall roof beams under the 10 Ton crane. 4VQ3 weighed 5900 Lbs. using Plants Groups "RON Load scale". It was 60uSv/Hr @ 0.5 M on the upstream side with no contamination on the swipes.
The total accumulated dose received was 0.34mSv spread amongst 7 people.
See the attached photos. |
|
|
|
|
|
|