Message ID: 8     Entry time: Thursday, October 11, 2012, 16:40
Author: Keith C Ng 
Category: M9 
Type: Repair 
Subject: m9 t2 joint repair 

Today:

Bridge setup complete; Noticed 12 x 3 x 3 block when placed on top of several other blocks rocked when placed down.

Took initial photos of joint: west side approximately 0.05" to 0.06" gap, east side 0.20" to 0.220" gap. Joint appears to be the same as before. See photos.

 

Will do visual/video inspection and leak check tomorrow morning.

Attachment 1: 20121011_RH1_01_0357.JPG  6.395 MB  | Show | Hide all
Attachment 2: 20121011_RH1_02_0367.JPG  3.944 MB  | Hide | Hide all
20121011_RH1_02_0367.JPG
Attachment 3: 20121011_RH1_02_0362.JPG  4.044 MB  | Show | Hide all
Attachment 4: 20121011_RH1_02_0363.JPG  3.596 MB  | Show | Hide all