Message ID: 79     Entry time: Wednesday, April 08, 2015, 14:18
Author: Keith C Ng 
Category: M9 
Type: Development 
Subject: m9 t2 alignment job 

1) Visual inspection of T2 M9 flange: no obvious indium deposits on T2 flange knife edge seen, left over indium from before 2013 is still present on counter bore. See screen captures. Screen captures show state of flange after removing blanking plate, no cleaning was performed after removal.

vlcsnap-00011.jpgvlcsnap-00010.jpgvlcsnap-00002.jpgvlcsnap-00013.jpg

vlcsnap-00006.jpgvlcsnap-00005.jpgvlcsnap-00007.jpgvlcsnap-00004.jpg

2) Rlanking plate with rubber seal installed on T2M9 exit port at noon. T2 volume pumping started around 13:00.

2)  Plot of pressure over a week period of 1ACG3, units in Torr:

2015apr8_xtpage1acg3.jpg

Attachment 6: vlcsnap-00003.jpg  25 kB  Uploaded Wednesday, April 08, 2015, 15:44  | Show | Hide all
Attachment 7: vlcsnap-00006.jpg  11 kB  Uploaded Wednesday, April 08, 2015, 15:45  | Show | Hide all
Attachment 8: vlcsnap-00005.jpg  31 kB  Uploaded Wednesday, April 08, 2015, 15:45  | Hide | Hide all