Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Beamlines  Not logged in ELOG logo
Message ID: 68     Entry time: Friday, February 13, 2015, 15:10
Author: Keith C Ng 
Category: Primary Beamlines 
Type: Development 
Subject: IVM3-IVQ4 indium joint section (WR #2686) 

Installed 4" indium seal at 1VM3 to IVQ4. No real problems with installation.

 

20150213_ucnbuild_IMG_1304.JPG20150213_ucnbuild_IMG_1308.JPG

Attachment 2: 20150213_ucnbuild_IMG_1305.JPG  2.984 MB  | Show | Show all
ELOG V2.9.2-2455