Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Beamlines  Not logged in ELOG logo
Message ID: 5     Entry time: Friday, February 17, 2012, 15:35
Author: Keith C Ng 
Category: M20 
Type: Repair 
Subject: m20 q1 q2 repair 

Reinstalled ceramic insulators #6 7 8 to Q1 magnet by C Ballard. #6 and 8 went on with no issues. The copper tubing on insulator #7 had to be bent to match the new position of the re-brazed #7 fitting. This may have been due to the removal of the inner and outer conductors (the two copper plates that clamp the two coils together) during yesterdays repair which shifted the position of the coil. See photos.

Attachment 1: P1020033.JPG  5.230 MB  | Show | Hide all
Attachment 2: P1020037.JPG  5.610 MB  | Hide | Hide all
P1020037.JPG
Attachment 3: P1020038.JPG  5.302 MB  | Show | Hide all
Attachment 4: P1020035.JPG  5.246 MB  | Show | Hide all
Attachment 5: P1020031.JPG  5.257 MB  | Show | Hide all
ELOG V2.9.2-2455