Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Beamlines  Not logged in ELOG logo
Message ID: 2     Entry time: Tuesday, February 14, 2012, 16:29
Author: Keith C Ng 
Category: M20 
Type: Repair 
Subject: m20 q1 q2 repair 

Warm cell reconfigured for water leak repair at coil termination. Radiation surveys done. M20 Q1 ready for removal of insulators.

Attached photo of warm cell as of Tuesday morning.

Attachment 1: P1010986.JPG  5.456 MB  | Hide | Hide all
P1010986.JPG
ELOG V2.9.2-2455