Message ID: 130     Entry time: Friday, May 06, 2022, 11:27
Author: Keith C Ng 
Category: Primary Beamlines 
Type: Standard Operation 
Subject: 4V CM1 RH joint install 

 2022 Apr 28 to 29:

Installed a new remote handling 4" indium joint for new beamline 4 north section. Issues were encountered in clearance between the downstream steering magnet and the compression collar of the joint. Joint installation itself went smoothly. 

The drive screw is a 17mm hex instead of a 5/8". This was noted in the install of the blank off plate in 2016.

See attached pdf report for photos and more description.

Attachment 1: 2022_4v_cm1_rh_joint_install.pdf  3.298 MB  | Hide | Hide all
2022_4v_cm1_rh_joint_install.pdf 2022_4v_cm1_rh_joint_install.pdf 2022_4v_cm1_rh_joint_install.pdf 2022_4v_cm1_rh_joint_install.pdf